Well I suppose you could say the messy tricky bit is nearly done.
Lots of new pipe has gone in and it has taken all day.
Basically the central heating is being split. Half the building already gets good warmth from the log fires so the central heating there has been left attached to the oil system that still heats our water.
The rest of the building has been attached to the new big log boiler this has meant running pipes a long way along the building, stop ending the current system and being ready to connect the new system in.
Of course this is not a modern house with simple little cement blocks this house was made in granite with walls 3 foot thick. It's lucky we only needed to go through one traditional wall, my 1000W SDS drill took nearly 20 minutes to make 2 holes, thats 20 minutes each by the way!!!
Tomorrow it's fit three extra radiators, wire in a central heating pump, up into the attic to put in a water tank then run the last few pipes in to connect it all up.
Sounds simple.....
Management has been fairly content, the odd sigh, a bit of pipe, when checked with a theodolite might have been not quite at the angle she required, easily sorted when she wasn't looking, slide the stove across the floor.
The copper pipe we have is about 4 inches to short and I need one extra compression joint but hell that's how building work is supposed to be isn't it...
R
Sunday, 25 October 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment